04 Oct 2019
PAC Electrical won a tender for the installation of a new sub mains to an existing control panel in a leading industrial factory in the greater Belfast area.
OBJECTIVE
This industrial client required a 200amp 3-phase and neutral supply to be installed to a pre-existing control panel, along with new containment and an earthing system.
PROCESS
PAC Electrical’s design team were able to specify the correct cable type and size, along with a separate earth for the 200amp supply. Once the specification of the install had been designed, our team set to work on the installation, which included the following:
Due to the layout and configuration of the building, the installation of the cable run was challenging, but our team was able to overcome this with their experience and skill-sets coming to the fore.
OUTCOME
PAC Electrical delivered the install of the mains cable with minimum disruption to the client, and all work was carried out under BS7671 with a full set of Risk Assessments and Method Statements (RAMS).